ABOUT THIS PROJECT
Design and installation of a 240 ton beet storage primary R-407C refrigerant, secondary propylene glycol refrigeration system, CO2 removal ventilation system, and storage humidification system.
- Duration: 6 months
- Completed: August 2016
- Scope: HVAC, Controls, Process Piping, Refrigeration